The challenging questions were:
Who can help the customer to fully replace TELON in a short space of time?
Which process is sufficiently stable and proven on the one hand and flexible and adaptable enough on the other hand to deal with the large volumes and complex infrastructure?
Which partner has enough manpower and expertise to relieve the customer‘s small team of TELON experts during the replacement?
... without overloading the severely limited internal TELON team.
... without having to involve the application stakeholders too heavily
The customer found the answer in the partnership with PKS
PKS was selected to carry out the TELON replacement. PKS was able to implement the replacement within 12 months. A key element was the reprogramming of the TELON runtime modules. PKS has a mature process for fully automated re-engineering of the COBOL code generated from TELON and converting it into maintainable, native COBOL code. The code is then further developed in modern mainframe IDE IDz.
In addition, it was necessary to replace all TELON runtimes that had previously been used. This made it possible to completely withdraw from the dependency with the Telon product.
The customer benefits from the following advantages:
Modern and native mainframe environment unlocks innovation potential and enables real, seamless integration into the CI/CD pipeline.
Cost savings due to elimination of TELON maintenance.
Security and control during implementation thanks to proven migration process, upstream PoC and 100% of automation, apart from Telon runtime moduls.
High acceptance of the solution in the development team, cooperation on an equal footing with the PKS team, flexibility in contract design within the framework of the Group‘s specifications.
It was both exciting and challenging to immerse ourselves in a decades-old generator technology and to confront it with the modern methods of our technology.
Udo Heyn
Senior Software Architect & Developer
PKS Software GmbH
How was it implemented?
First, the project was tested as part of a 3-month PoC in spring 2022. PKS scanned the complete source code inventory, special features were identified and an initial idea for the desired syntax was jointly developed. The PoC demonstrated the technical feasibility and defined the requirements for the conversion. 1411 program sources were analyzed. From this, a number of runtime modules were identified that had to be completely rewritten in Assembler.
The interaction of the mature PKS technology and an experienced team of experts are the success factor in these complex migration projects. The excellent teamwork between PKS and KBC deserves special mention.
Bernd Butscher
Head of Enterprise Software Transformation
PKS Software GmbH
Next steps
The successful replacement serves as a blueprint for further 4GL replacements: on the basis of the successful TELON Dismissal project with KBC, the management has gladly decided to investigate possible other 4GL replacement projects.
You can also benefit from PKS‘s concentrated analysis and transformation experience and utilize the potential of the mainframe for the future of your core business.